Procurement strategy
Getting procurement right at the start of a construction project prevents disputes later. RKA Associates advise contractors and employer clients on procurement route selection, contract form choice (NEC, FIDIC, JCT or bespoke), tender documentation, bid analysis and supply chain management. We work with clients on infrastructure, water, civil engineering and building projects UK wide.
- Procurement route appraisal and recommendation
- NEC, FIDIC and JCT contract form selection advice
- Tender documentation preparation and review
- Bid analysis, evaluation and recommendation
- Subcontract procurement and supply chain management
- Framework agreement setup and management
- Pre-qualification assessment (including Achilles UVDB)
Procurement advice for clients and developers
The commercial outcome of a project is mostly decided before anyone goes on site: by the procurement route, the form of contract, the amendments and the tender documents. We advise developers, public bodies, operators and other construction clients on all four, with an eye on how the project will actually be run and what it will cost if it goes wrong.
Choosing the procurement route
- Traditional. Design complete before tender: the most price certainty and the slowest start.
- Design and build. Single-point responsibility, with a price only as certain as the Employer's Requirements are complete.
- Two-stage tendering. Early contractor involvement and a faster start, at the cost of negotiating the second-stage price without competition.
- Target cost (NEC Options C and D). Shared pain and gain around a target, which needs an owner team able to check Defined Cost.
- Frameworks. Repeat work with known contractors, common for public sector and utility clients.
Choosing between NEC, JCT and FIDIC
JCT suits building work with a settled design and a client who wants the contract to run in the background. NEC suits infrastructure and complex projects where the client is prepared to manage actively, through early warnings, programme acceptance and compensation events. FIDIC is the international standard and the natural choice for projects outside the UK or with international funding. The worst choice is any of them administered by a team trained on another.
Public sector clients and the Procurement Act 2023
For public bodies in England, Wales and Northern Ireland, procurements started since 24 February 2025 run under the Procurement Act 2023, with its open and competitive flexible procedures and the move from the most economically advantageous tender to the most advantageous tender. We help public clients design tender processes that fit the form of contract they intend to use.
Tender documents, evaluation and award
We prepare or review the tender documents, contract data and amendments, run the clarification process, evaluate returns on price and quality, and normalise bids so they can be compared fairly. We also test the preferred contractor's programme and pricing assumptions before award, because the cheapest tender is often cheapest by omission.
Procurement for main contractors
For main contractors we run subcontract procurement: package strategy, enquiry documents, tender analysis, and subcontract award on terms that sit properly under the main contract.
Procurement questions
Should I use NEC or JCT for my project?
JCT for straightforward building work with a settled design and a lump sum; NEC where the scope is less certain, the work is engineering-heavy, or you want to manage change as it happens. The answer also depends on who will administer it, because NEC needs an engaged project manager.
What is the best procurement route for a data centre project?
Usually one that involves the specialist M&E contractors early, because the mechanical and electrical packages carry most of the cost and the longest lead times. What matters most is clarity about who carries design development and equipment price risk. See data centre projects.
Do you advise clients outside the UK on procurement?
Yes, mainly on FIDIC-based procurement in the Middle East and on internationally funded projects. See international work.